Q0.1Is the building work residential or non-residential?
This determines which requirements of Schedule 1 apply
1Nature of the building workReg. 3(1)
Q1.1Is the work the erection of a new building?
Q1.2Is the work an extension to an existing building?
Q1.3Does the work involve the provision or extension of a controlled service or fitting?
If yes, Section 2 will be presented
Q1.4Does the work constitute a material alteration?
If yes, Section 3 will be presented
Q1.5Does the work involve a material change of use?
If yes, Section 4 will be presented
Q1.6Does the work involve inserting insulation into an existing cavity wall?
Q1.7Does the work involve underpinning a building?
Q1.8Does the work involve changing the energy status of a building or part of a building?
Q1.9Does the work involve upgrading the thermal performance of an existing building element (floor, wall, roof, window or door)?
Q1.10Does the work trigger consequential improvements to energy performance?
1APurpose Group & Building HeightAD B — Appendix B
Presented because Q1.1, Q1.2, Q1.3 or Q1.4 = Yes
Q1A.1What is the Purpose Group of the building?
For Q1.3 and Q1.4 this relates to the existing building
Q1A.2What is the height of the highest floor level above (or below) ground?
2Controlled services and fittingsReg. 3(1)(b)
Presented because Q1.3 = Yes
Q2.1Does the work involve a cold water supply system?
Req. G1
Q2.2Does the work involve a hot water supply system or unvented hot water storage?
Req. G3
Q2.3Does the work involve foul water drainage?
Req. H1
Q2.4Does the work involve a wastewater treatment system or cesspool?
Req. H2
Q2.5Does the work involve rainwater drainage?
Req. H3
Q2.6Does the work involve solid waste storage?
Req. H6
Q2.7Does the work involve a heat-producing combustion appliance (gas, oil, or solid fuel)?
Reqs. J1–J5
Q2.8Does the work involve liquid fuel storage?
Reqs. J6–J7
Q2.9Does the work involve an electrical installation?
Req. P1
Q2.10Does the work involve a mechanical ventilation system?
Req. F1
Q2.11Does the work involve lighting, heating, controls or a heat pump (ground source or air source)?
Req. L1
Q2.12Does the work involve on-site electricity generation (e.g. solar PV)?
Req. L2
3Material alterationReg. 3(1)(c) & 3(2)
Presented because Q1.4 = Yes
Q3.1Does the alteration affect the structural stability of the building?
Part A
Q3.2Does the alteration affect the means of warning and escape from fire?
Requirement B1
Q3.3Does the alteration affect internal fire spread through the structure?
Requirement B3
Q3.4Does the alteration affect external fire spread?
Requirement B4
Q3.5Does the alteration affect access and facilities for the fire service?
Requirement B5
Q3.6Does the alteration affect access to and use of the building?
Part M
Q3.7Does the alteration affect toilet accommodation?
Part T
4Change of useReg. 5
Presented because Q1.5 = Yes
Q4.1After the change, will the building be used as a dwelling where previously it was not?
Reg. 5(a)
Q4.2After the change, will the building contain a flat where previously it did not?
Reg. 5(b)
Q4.3After the change, will the building be used as a hotel or boarding house where previously it was not?
Reg. 5(c)
Q4.4After the change, will the building be used as an institution where previously it was not?
Reg. 5(d)
Q4.5After the change, will the building be used as a public building where previously it was not?
Reg. 5(e)
Q4.6Was the building previously within Schedule 2 (exempt buildings) and will it cease to be so after the change?
Reg. 5(f)
Q4.7Does the building contain at least one dwelling, and will the change result in a greater or lesser number of dwellings than previously?
Reg. 5(g)
Q4.8After the change, will the building contain a room for residential purposes where previously it did not?
Reg. 5(h)
Q4.9Does the building already contain rooms for residential purposes, and will the change result in a greater or lesser number of such rooms than previously?
Reg. 5(i)
Q4.10After the change, will the building be used as a shop where previously it was not?
Reg. 5(j)
Q4.11After the change, will the building become a higher-risk residential building (HRRB) where previously it was not?
Reg. 5(k)
Q4.12Is the change of use of the whole building or part only?
Schedule of building work
Phase 1 output — items confirmed Yes
No items recorded yet. Answer the questions to build the schedule.