Building Regulations 2010

Phase 1 — Schedule of Building Work Intake

0 Type of building Schedule 1
Q0.1 Is the building work residential or non-residential?
This determines which requirements of Schedule 1 apply
1 Nature of the building work Reg. 3(1)
Q1.1 Is the work the erection of a new building?
Q1.2 Is the work an extension to an existing building?
Q1.3 Does the work involve the provision or extension of a controlled service or fitting?
If yes, Section 2 will be presented
Q1.4 Does the work constitute a material alteration?
If yes, Section 3 will be presented
Q1.5 Does the work involve a material change of use?
If yes, Section 4 will be presented
Q1.6 Does the work involve inserting insulation into an existing cavity wall?
Q1.7 Does the work involve underpinning a building?
Q1.8 Does the work involve changing the energy status of a building or part of a building?
Q1.9 Does the work involve upgrading the thermal performance of an existing building element (floor, wall, roof, window or door)?
Q1.10 Does the work trigger consequential improvements to energy performance?

Schedule of building work

Phase 1 output — items confirmed Yes
No items recorded yet. Answer the questions to build the schedule.